18av在线视频,好男人在在线社区WWW在线影院,好男人视频在线观看影院 http://www.qfmxc.cn/ru Fri, 04 Jul 2025 02:26:48 +0000 ru-RU почасовая 1 https://wordpress.org/?v=6.8.1 http://www.qfmxc.cn/wp-content/uploads/2025/03/logo1-100x100.png Jiangsu New Hongda Group Co., Ltd. http://www.qfmxc.cn/ru 32 32 Maximize Metal Recovery: A Practical Guide to Efficient Hydrometallurgy http://www.qfmxc.cn/ru/maximize-metal-recovery-a-practical-guide-to-efficient-hydrometallurgy/ http://www.qfmxc.cn/ru/maximize-metal-recovery-a-practical-guide-to-efficient-hydrometallurgy/#respond Wed, 02 Jul 2025 02:42:35 +0000 http://www.qfmxc.cn/?p=4922 Maximize Metal Recovery: A Practical Guide to Efficient Hydrometallurgy

What is Hydrometallurgy and Why is it Important?

Hydrometallurgy extracts metals from ores and concentrates through aqueous solutions. Compared with pyrometallurgy, hydrometallurgy has the advantages of low energy consumption, less pollution, and high resource recycling rate. The process is simple and easy to automate. It is environmentally friendly and in line with the trend of green development. You can find many hydrometallurgy examples in the new energy industry. High-purity metals such as lithium, cobalt, and nickel rely on hydrometallurgical technology. These are the core raw materials of lithium batteries and energy storage systems.

In modern hydrometallurgical plants, operators are constantly striving to boost metal recovery rates while keeping a close eye on operational costs, energy use, and environmental compliance. From ore leaching to purification, every stage must strike a delicate balance between efficiency and safety. In this context, selecting the right thickener and agitator becomes critical—these core components directly affect process stability, energy consumption, and material loss.

hydrometallurgy process

Analyze the Core Stages and Process Requirements of Hydrometallurgy

The Hydrometallurgy process mainly consists of three core stages: leaching, solution concentration and purification, and metal recovery.

Leaching stage: Metals are dissolved from ores by acid, alkali, cyanide or biological leaching. Common methods include heap leaching, vat leaching and in-situ leaching. Uniform pulp distribution and effective mixing are critical for maximizing the contact between the leaching agent and the ore—both of which directly impact leaching efficiency and reaction speed. Without proper agitation, dead zones can form within the tank, leading to incomplete reactions, lower metal recovery rates, and wasted reagents. That’s why corrosion-resistant, high-performance stirring equipment is essential in any hydrometallurgical setup.

Solution concentration and purification stage: Solvent extraction (SX), ion exchange, and precipitation methods are adopted to remove impurities and increase the concentration of metal ions. It is necessary to precisely control the flow rate, stir evenly and moderately, and complete the separation operation efficiently.

Metal recovery stage: Metals are recovered through electrolytic deposition, precipitation and cementation methods.?Before these methods,?unimpeded solution flow and effective solid-liquid separation are essential for maximizing metal recovery and ensuring high product purity. Poor thickener performance can lead to turbid solutions, increased metal loss, and downstream issues such as inefficient electrolysis and contaminated final products. For hydrometallurgical operations, a reliable thickening system is not just beneficial—it’s critical to process success.

Key Equipment Selection Points in?Hydrometallurgical Extraction

To avoid these risks and ensure optimal process performance, careful attention must be given to equipment selection. The choice of thickeners and agitators directly influences efficiency, operational cost, and system stability. The following key factors should be considered:

1.?Clear project requirements:

Ore type: select leaching process and equipment according to chemical composition and particle size.

Processing capacity: match daily/hourly processing volume to avoid insufficient or excessive capacity.

Leaching agent: select corrosion-resistant equipment, suitable for sulfuric acid, cyanide, etc.

Residue treatment:?select solid-liquid separation equipment according to residue characteristics and environmental protection requirements.

2.?Select the type of thickener?and agitator:

Сгуститель:

Deep cone thickener: suitable for high-concentration, high-viscosity slurry, small footprint, high efficiency, commonly used in gold and copper extraction.

High-speed thickener: suitable for rapid separation of large-volume, low-concentration materials.

The selection should consider the slurry properties, sedimentation rate and tailings standards.

Загуститель для оседания и разделения

Agitator:

Side-entry type is suitable for large tanks and easy maintenance; top-mounted type is suitable for small tanks and uniform mixing.

Single impeller is suitable for low viscosity, and dual impeller or specialized designs are suitable for high-concentration?and complex fluids.

Optimize the selection according to the tank size and slurry viscosity.

Agitator for nonferrous industry

3. Material and corrosion resistance:

In hydrometallurgical operations, equipment is frequently exposed to highly acidic environments, making material selection critical. To balance corrosion resistance and structural strength, rubber linings or steel-polymer coatings are commonly recommended for standard conditions. However, in more extreme chemical settings, titanium alloys or high-nickel alloys offer superior durability. Regardless of the chosen material, regular inspection of protective coatings is essential to prevent localized corrosion. If left unchecked, material failure can lead to unplanned downtime, costly equipment replacements, and serious disruptions to the production process.

4. Automation compatibility:

Integration with plant control systems (PLC/DCS) is now a necessity for modern, efficient operations. Equipment must be capable of supporting automation features such as real-time monitoring of pH, flow rate, and viscosity. Compatibility with remote monitoring and data analysis platforms further enhances process visibility and control, ultimately contributing to greater operational stability and reduced human error.

Installation and Maintenance Essentials for Hydrometallurgy Equipment

Installation precautions:

  • Evaluate the site (load bearing, corrosion exposure).
  • Installed by professionals.
  • Reasonably arrange pipelines and slurry flow channels.
  • Ensure the agitator is grounded to prevent static electricity.
  • Set up clear warning signs.

Maintenance best practices:

  • Prevent slurry overload or excessive torque on the agitator shaft.
  • Calibrate equipment regularly (especially automated systems).
  • Clean the thickener sedimentation area to prevent clogging.

The NHD Advantage in Hydrometallurgy

NHD’s agitators and high-efficiency thickeners are specially engineered for pretreatment, leaching, and solid-liquid separation in hydrometallurgy, widely applied in copper, nickel, cobalt, and other non-ferrous metal recovery.

NHD agitators feature CFD/CFM-optimized fluid dynamics for superior mixing efficiency in hydrometallurgical applications. The patented no-downtime seal replacement system ensures continuous operation. Custom-engineered shafts and impellers with advanced linings withstand harsh corrosive and abrasive conditions while delivering powerful mixing action.

NHD thickeners provide customized solutions through settling tests and rheology analysis, featuring multi-drive configurations, smart automation, and anti-jamming rakes for reliable operation. Their low-leakage mechanical design and proven performance in phosphate, alumina, and non-ferrous applications ensure versatile processing capabilities.

Building on these advanced thickening and mixing technology, NHD’s integrated solutions help operations achieve improved metal recovery, enhanced process efficiency, and reduced maintenance requirements, supporting more sustainable and stable production outcomes.

Conclusion

Hydrometallurgy relies on high-efficiency agitators and thickeners to achieve metal dissolution, purification and recovery. NHD?has been deeply engaged in the equipment field, such as chemical mixing tank with agitator, providing customized thickener and agitator solutions. We precisely match the characteristics of the ore, processing scale and process requirements. We offer full support from design to operation and maintenance, helping projects reduce costs and increase efficiency. Reach our experts at sales@chinanhd.com.

]]>
http://www.qfmxc.cn/ru/maximize-metal-recovery-a-practical-guide-to-efficient-hydrometallurgy/feed/ 0
300kt/a Phase 1&2&3 PA Project for Guizhou LuFa Industry Co., Ltd. http://www.qfmxc.cn/ru/300kt-a-phase-123-pa-project-for-guizhou-lufa-industry-co-ltd/ http://www.qfmxc.cn/ru/300kt-a-phase-123-pa-project-for-guizhou-lufa-industry-co-ltd/#respond Thu, 29 May 2025 07:59:23 +0000 http://www.qfmxc.cn/?p=3172 For more project details, feel free to contact us.

]]>
http://www.qfmxc.cn/ru/300kt-a-phase-123-pa-project-for-guizhou-lufa-industry-co-ltd/feed/ 0
50kt/a PA and 100kt/a Powdered MAP Project for Qinghai Chuangxin Mining Development Co., Ltd. http://www.qfmxc.cn/ru/50kt-a-pa-and-100kt-a-powdered-map-project-for-qinghai-chuangxin-mining-development-co-ltd/ http://www.qfmxc.cn/ru/50kt-a-pa-and-100kt-a-powdered-map-project-for-qinghai-chuangxin-mining-development-co-ltd/#respond Thu, 29 May 2025 07:54:12 +0000 http://www.qfmxc.cn/?p=3163 Key Challenges:

  • Tailored for plateau conditions
  • Complies with stringent environmental protections

Our Solutions:

  • Superior corrosion-resistant equipment?with low energy consumption and extended operation cycles
  • Digital management system?ensuring optimized performance
  • Resource recycling framework?supporting sustainable development in high-altitude phosphorus chemical industries

For more project details, feel free to contact us.

]]>
http://www.qfmxc.cn/ru/50kt-a-pa-and-100kt-a-powdered-map-project-for-qinghai-chuangxin-mining-development-co-ltd/feed/ 0
200kt/a MAP Project for Yunnan Evergreen Chemical Co., Ltd. http://www.qfmxc.cn/ru/200kt-a-map-project-for-yunnan-evergreen-chemical-co-ltd/ http://www.qfmxc.cn/ru/200kt-a-map-project-for-yunnan-evergreen-chemical-co-ltd/#respond Thu, 29 May 2025 07:56:51 +0000 http://www.qfmxc.cn/?p=3169 For more project details, feel free to contact us.

]]>
http://www.qfmxc.cn/ru/200kt-a-map-project-for-yunnan-evergreen-chemical-co-ltd/feed/ 0
EPC Project for Yunnan Xiangfeng Jinmai Chemical Co., Ltd http://www.qfmxc.cn/ru/epc-project-for-yunnan-xiangfeng-jinmai-chemical-co-ltd/ http://www.qfmxc.cn/ru/epc-project-for-yunnan-xiangfeng-jinmai-chemical-co-ltd/#respond Thu, 29 May 2025 07:51:11 +0000 http://www.qfmxc.cn/?p=3159 Key Challenges:

  • Corrosion control?in wet-process phosphoric acid purification
  • Impurity separation?for high-impurity phosphate ores (Yunnan type)
  • Energy consumption reductionwith consistent acid quality

Our Solutions:

  • Highly corrosion-resistant scrubbers & stripping towers for wet-process phosphoric acid purification
  • Efficient mass transfer & smart O&M addressing impurity separation and energy consumption challenges
  • Material & process innovations tailored for high-impurity phosphate ores, enhancing acid quality and cost-efficiency

This project establishes benchmark solution for comparable wet-process phosphoric acid projects.

For more project details, feel free to contact us.

]]>
http://www.qfmxc.cn/ru/epc-project-for-yunnan-xiangfeng-jinmai-chemical-co-ltd/feed/ 0
EPC Project of Flue Gas Desulfurization for Shandong Xinfa Group http://www.qfmxc.cn/ru/epc-project-of-flue-gas-desulfurization-for-shandong-xinfa-group/ http://www.qfmxc.cn/ru/epc-project-of-flue-gas-desulfurization-for-shandong-xinfa-group/#respond Thu, 29 May 2025 07:34:12 +0000 http://www.qfmxc.cn/?p=3153 Key Challenge:

  • The corrosion issue of absorption towers in high-sulfur flue gas environments

Our Solution:

  • Replaced traditional FRP/Rubber lining systems with?SuperAustenitic +Hastelloy

Core Advantages:

  • Extended service life?– Eliminates frequent maintenance needs
  • Enhanced reliability?– Withstands high-sulfur flue gas environments
  • Superior material performance?– Proven corrosion resistance

For more project details, feel free to contact us.

]]>
http://www.qfmxc.cn/ru/epc-project-of-flue-gas-desulfurization-for-shandong-xinfa-group/feed/ 0
EPC Project for Golmud Zangge Potassic Fertilizer Co., Ltd http://www.qfmxc.cn/ru/epc-project-for-golmud-zangge-potassic-fertilizer-co-ltd/ http://www.qfmxc.cn/ru/epc-project-for-golmud-zangge-potassic-fertilizer-co-ltd/#respond Thu, 29 May 2025 07:26:53 +0000 http://www.qfmxc.cn/?p=3144 Key Challenges:

  • High energy consumption in traditional potassic fertilizer production
  • Unstable crystal quality
  • Stringent environmental compliance

Our Solutions:

  • Energy-efficient hot melting & crystallization system
  • Intelligent control for stable crystal quality
  • Eco-friendly design meeting strict environmental standards

For more project details, feel free to contact us.

]]>
http://www.qfmxc.cn/ru/epc-project-for-golmud-zangge-potassic-fertilizer-co-ltd/feed/ 0
80kt/a Phosphoric Acid Project in Brazil http://www.qfmxc.cn/ru/80kt-a-phosphoric-acid-project-in-brazil/ http://www.qfmxc.cn/ru/80kt-a-phosphoric-acid-project-in-brazil/#respond Thu, 29 May 2025 07:22:55 +0000 http://www.qfmxc.cn/?p=3138 This project?involved a rotary table?vacuum?filter replacement for Anglo?American’s Brazilian subsidiary COPEBRAS, delivered in collaboration between NHD and WesTech Engineering from the United States.

Key Challenges:
? First-time collaboration with WesTech Engineering
? Required full compliance with US quality management standards
? 12-month evaluation period prior to contract award (April 2013)

Our Solutions:
? Accepted WesTech’s quality engineer for full-process supervision
? Achieved full compliance in?product quality?and field installation

Client Feedback:
? Successfully met all international standards
? Completed the partnership to full satisfaction

For more project details, feel free to contact us.

]]>
http://www.qfmxc.cn/ru/80kt-a-phosphoric-acid-project-in-brazil/feed/ 0
80kt/a Phosphoric Acid Project for Kimia Daran Kavir Co. in West Asia http://www.qfmxc.cn/ru/80kt-a-phosphoric-acid-project-for-kimia-daran-kavir-co-in-west-asia/ http://www.qfmxc.cn/ru/80kt-a-phosphoric-acid-project-for-kimia-daran-kavir-co-in-west-asia/#respond Thu, 29 May 2025 07:17:57 +0000 http://www.qfmxc.cn/?p=3131 For more project details, feel free to contact us.

]]>
http://www.qfmxc.cn/ru/80kt-a-phosphoric-acid-project-for-kimia-daran-kavir-co-in-west-asia/feed/ 0
Nickel and Cobalt Smelting Project for Lygend Mining in Indonesia http://www.qfmxc.cn/ru/nickel-and-cobalt-smelting-project-for-lygend-mining-in-indonesia/ http://www.qfmxc.cn/ru/nickel-and-cobalt-smelting-project-for-lygend-mining-in-indonesia/#respond Thu, 29 May 2025 06:40:29 +0000 http://www.qfmxc.cn/?p=3124 Key Challenges:
? High seismic risk in Pacific Ring of Volcano?location
? Pandemic-related construction constraints

Our Solutions:
? Innovative adoption of duplex stainless-steel material
? Replaced traditional carbon steel/rubber-brick lined tank design

Client Feedback:

NHD’s?solution not only ensured equipment structural integrity but also significantly reduced civil construction timeframes. Particularly during the pandemic period, it provided robust technical support and equipment reliability that enabled the client to achieve Phase 1 production targets and subsequent over-production goals.

For more project details, feel free to contact us.

]]>
http://www.qfmxc.cn/ru/nickel-and-cobalt-smelting-project-for-lygend-mining-in-indonesia/feed/ 0
主站蜘蛛池模板: 沂源县| 潢川县| 昌吉市| 嘉鱼县| 藁城市| 龙州县| 庄浪县| 梨树县| 思南县| 勃利县| 东明县| 巴中市| 比如县| 元氏县| 柳河县| 启东市| 邹城市| 丹江口市| 秦安县| 阿鲁科尔沁旗| 正安县| 屯门区| 镇宁| 嘉荫县| 顺昌县| 河池市| 广宁县| 神木县| 永登县| 大英县| 渝北区| 大冶市| 卫辉市| 淮南市| 东港市| 沛县| 余姚市| 罗源县| 饶阳县| 伊通| 凯里市|