Key Challenges:
? First-time collaboration with WesTech Engineering
? Required full compliance with US quality management standards
? 12-month evaluation period prior to contract award (April 2013)
Our Solutions:
? Accepted WesTech’s quality engineer for full-process supervision
? Achieved full compliance in?product quality?and field installation
Client Feedback:
? Successfully met all international standards
? Completed the partnership to full satisfaction
For more project details, feel free to contact us.
]]>Our Solutions:
? Innovative adoption of duplex stainless-steel material
? Replaced traditional carbon steel/rubber-brick lined tank design
Client Feedback:
NHD’s?solution not only ensured equipment structural integrity but also significantly reduced civil construction timeframes. Particularly during the pandemic period, it provided robust technical support and equipment reliability that enabled the client to achieve Phase 1 production targets and subsequent over-production goals.
For more project details, feel free to contact us.
]]>For more project details, feel free to contact us.
]]>For more project details, feel free to contact us.
]]>? Second overseas retrofit project involving complete filtration system (including pumps, piping, and separators)
? Required installation of larger equipment (replacing existing 77m2 filter) to meet client’s capacity expansion needs
? First overseas self-installation project with strict quality supervision by French engineering inspectors
Our Solutions:
? Deployed?multi-disciplinary team (process/technical/equipment engineers) for on-site assessment
? Developed innovative elevated installation solution
? Conducted targeted civil structure reinforcement
? Implemented two-shift work schedule with local workforce coordination
Client Feedback:
The 72-hour continuous operation test demonstrated outstanding performance:
For more project details, feel free to contact us.
]]>20m2 Horizontal Belt Filter for Phosphate Rock Mining
Project Overview:
Key Challenges:
Our Solutions:
Client Feedback:
Plans to gradually replace 3 older units at the site with our equipment, based on satisfactory operational results.
For more project details, feel free to contact us.
]]>Design and supply of Equipment of Modular Design for a heavy rare earth(Dysprosium & Terbium)?pilot plant (100kt/a capacity)
Key Challenges:
Our Solutions:
Client Feedback:
Received formal commendation from Northern Minerals for?standards-compliant design, seamless technical communication?and on-time delivery.
For more project details, feel free to contact us.
]]>